Executing a Test Switch
Execute a test switch to verify the system is working properly before
attaching all inputs and outputs. Aside from having signal cables
attached, the system is ready to perform switches when it ships from the
factory.
You can execute a test switch from the following:
ä
CP-10 Control Panel
ä
An external serial controller (computer, AMX, Crestron, etc.)
via BCS (Basic Control Structure) commands
Note: Before executing a test switch, attach only the first two inputs and
outputs described in the AutoPatch “8Y-XL Connector and Groupings
Guide” that came with your system.
The CP-10 test switch example (see page 7-2) routes input 2 to output 1
on Level 0 (your system may have been programmed with a different
level). The BCS Command test switch (see page 7-4) routes input 1 to
output 2 on Level 0. Before executing these switches, make sure the first
two inputs and outputs are connected exactly as shown on the AutoPatch
“8Y-XL Connector and Groupings Guide.”